Exam LEED-AP-O-M Topic 3 Question 22 Discussion

Actual exam question for USGBC's LEED-AP-O-M exam
Question #: 22
Topic #: 3
A LEED AP performs several on-site reviews for LEED compliance and encounters the followingscenarios.
Which scenario requires the installation of additional meters to comply with Energy and Atmosphere Prerequisite, Building-Level Energy Metering?

Suggested Answer: D Vote an answer

For a building that shares chilled water usage with other buildings on a campus, if the chilled water consumption is only measured at the campus level, additional meters would be required to comply with the Energy and Atmosphere Prerequisite for Building-Level Energy Metering. Individual metering at the building level is necessary to accurately track and manage the building's specific energy consumption, enabling targeted energy efficiency measures and compliance with LEED requirements.References:The Energy and Atmosphere section of the LEED O+M Reference Guide outlines the requirements for building-level energy metering, including the need for individual metering of significant energy uses such as chilled water in shared systems.

by Queena at Jan 07, 2026, 04:32 AM

Comments

Chosen Answer:
This is a voting comment (?) , you can switch to a simple comment.
Switch to a voting comment New
Nick name: Submit Cancel
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.