A customer tenant provides a VHD We lot hosting m your Microsoft System Center Virtual Machine Manager (SCVMM) fabric. You create a virtual machine (VM) named VM1 using 1the VMD file and deploy the VM to the tenant's VM network.
You need to ensure that the tenant can create new VMs based on VM1.
What should you do? To answer, select the appropriate options In the answer area.
NOTE Each correct selection is worth one point.


Explanation

You use VMWare vSphere to manage a virtualization environment. You have a virtual machine (VM) named VM1 that is configured to use an IDE controller. You deploy Microsoft System Center Virtual Machine Manager (SCVMM).
VM1 runs continuously to support a required organizational app. The only time VM1 is not running is during a scheduled maintenance window on Saturday morning between 1:00 and 4:00 AM. You must not shut down VM1 at any other time.
You need to migrate VM1 from VMWare to SCVMM. You must perform the migration as quickly as possible.
Solution: Configure VM1 to use a SCSI controller. Migrate VM1 on Saturday between 1:00 and 4:00 A.M.
Does the solution meet the goal?
Your company has two datacenters. You have Windows servers in both locations. The network that connects the datacenters has high bandwidth and low latency.
You are designing a new virtual machine (VM) and storage environment based on servers that run Windows Server 2016. You need to implement a solution that meets the following storage requirements:
*Tolerates the failure of a single datacenter.
*Ensures zero data loss in the event of a file system failure.
Solution: You implement offloaded data transfers.
Does the solution meet the goal?
You manage multiple Hyper-V clusters by using Microsoft system center virtual machine manager (SCVMM).
All servers run windows server 2012R2.
You must upgrade the nodes in the cluster by using SCVMM.
You identify the following requirement:
Do not make configuration changes to the management network adapter for the cluster Minimize cluster downtown for the upgrade process You need to create a template to upgrade nodes in the cluster.
Which 3 components should you configure? Each correct selection present part of the solution.
You need to configure the network settings for the SLB in the test environment.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
You manage a Microsoft System Center Virtual Machine Manager (SCVMM) environment. You plan to create virtual machine (VM) networks and IP address pools.
You need to ensure that VM networks are segmented.
Solution: You create a VM network with the No Isolation option.
Does the solution meet the goal?
You administer Microsoft System Center Virtual Machine Manager (SCVMM).
You need to access the Network Controller diagnostic logs.
Where should you view the logs?
You plan to deploy a Nano Server that has the Microsoft Hyper-V role installed.
You must deploy the Nano Server host in a hyper-converged mode that has a Microsoft System Center Virtual Machine Manager (SCVMM) agent installed. You need to prepare a Nano Server VHD for a physical machine.
Which three packages should you include in the VHD? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
You manage Microsoft System Center Virtual Machine Manager (SCVMM). You plan to implement a software load balancer (SLB) Multiplexer (MUX).
You need to configure the Microsoft Hyper-V host servers to host the MUX.
What should you do?
You manage a Microsoft System Center Virtual Machine Manager (SCVMM) environment. You plan to create virtual machine (VM) networks and IP address pools.
You need to ensure that VM networks are segmented.
Solution: You create a VM network and specify the Isolate using Hyper-V Network Virtualization option.
Does the solution meet the goal?