Click the Exhibit button.

A technician is asked to review the existing trunk information for a customer
According to the Element manager screen capture shown in the exhibit, which type of trunk is this?
A customer has Communication Server (CS) RLS. 7x system, and the technician wants to create an account capable of configuring a network Time Protocol (NTP) server.
What must be done to access the data and time parameters?
A customer has completed the installation of the Communication Server (CS) 1000E Rls. 7 x system and wants to access Base Manager to configure and provision the Linux Base.
Which two actions are true regarding access Base manager? (Choose two)
Refer to the exhibit.

A Communication Server 1000E Rls. 7 x customer is adding a new Human Resources department with eight IP telephone users. The customer has asked for the telephones to be programmed with consecutive Directory numbers (DNs) from their DID range (2000-2099).
Which numbers sequence is available to meet the customer's requirements?
A technician is planning an upgrade for a customer's Communication Server (CS) 1000E
Release 6.0 system to Release 7x.
Which two features are now to the Release 7x Deployment manager? (Choose two)
A technician deployed a Communication Server 1000E with dual homing feature configured. Both the T and 2T ports are connected on the media Gateway Controller
(MGC) one connection is active to avoid network loops.
Which two statements are true, if the connection to the active port on the MGC is host?
(Choose two)
A customer wants to build a new Ip node on their Communication Server (CS) 1000E system with three Signaling Servers. This node will support virtual trunks, IP media services, TPS and personnel directories. A technician logs into Elements manager to complete the configuration, after creating and saving the node configuration, the transfer now option chosen, then the servers are selected, the start sync is selected followed by restart application.
What is expected outcome from the system?