A customer would like to have the ability to dynamically adjust processor and memory allocations for a virtual machine. They are currently running VMware and Linux on x86.
What is a benefit of using PowerVM over VMware on x86?
A customer is designing a highly scalable cloud management and deployment solution using PowerVM NovaLink.
What does it mean when the HMC uses co-management mode?
A customer wants to provide redundant links to their network switches to increase bandwidth and availability.
This technique is referred to as:
What feature of PowerVM Enterprise Edition increases availability of production workloads?
A customer has a partitioned system running IBM i. The customer is considering a new system to replace the existing system and wants to add new WebSphere and Linux workloads.
Which of the following will assist in sizing the new system?
A customer with a Power System E870 with five IBM i licenses wants to replace it with a new Power System E980 for a new workload. They will require eight IBM i licenses.
What is the most cost-effective way for the customer to accomplish this?
Which of the following is true for systems virtualized with PowerVM?
Due to an emergency situation, a customer needs to activate all processor and memory resources in a Power System E980 for ten days.
Which of the following could be used to achieve this need with the least possible cost?
A customer with an AIX in-house SMT2 application on POWER6 would like to upgrade to POWER9. The customer would like to know the relative performance of the servers.
Which resource provides the SMT2 performance of the two systems?