The data on SPC charts are typically constructed such that they have the most recent data point on the right hand side.
The higher the sigma level of a process the better the performance.
SPC charts typically have the most recent data point on the right hand side.
When constructing a Fishbone Diagram using the ________ approach is the most classic arrangement.
The Z score is a measure of the distance in Standard Deviations of a sample data point from the Median of the sample population.
Six Sigma refers to a process whose output has at least 80% of its data points within +/- 6 Standard Deviations from the Mean.
When a Belt applies the practice of Poka-Yoke to a project challenge she is attempting to make certain the activity is _______________ .
Conducting a viable Capability Analysis using Attribute Data one must obtain a fairly large sample set to be statistically sound.
Cost of Poor Quality (COPQ) can be classified as Tangible (Visible) Costs and Hidden Costs.
The acronym for the defined approach taken by Lean Six Sigma to solve significant challenges related to a process is which of these?
The Z score is a measure of the distance in Standard Deviations of a sample data point from the Median of the sample population.
In the late 1980's William Smith coined the name Six Sigma for a methodology that had its origins at __________________ for quality related work being done there.
The 80:20 rule is associated with which of these tools?