What are the consequences of a confirmation of an operation? (Choose two.)
Which of the following efforts can be minimized using the KANBAN procedure?
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon is to be set equally for all materials by default. However, some materials are to be given a different planning horizon.
What procedure would you recommend to the project team for setting the planning horizon on the system side?
In your company planning strategies are used in the SAP-ECC demand management that are based on consumption. Which of the following statements about consumption is true?
(Choose two.)
In the course of a project phase, the customer raises some questions concerning parameters of the procurement type in the material master in the SAP ECC system. Which of the following
procurement type properties apply? (Choose two.)
In the task list, there is the possibility to work with suboperations.
What can you do in more detail by using suboperations? (Choose two.)
The master data for a logistical process is to be stored in the SAP ECC system. In this context, you require the production versions for subsequent planning and production. You know a mass maintenance transaction that you could use here. Where else in the SAP ECC system could you define production versions?
Which data forms the basis for calculating the capacity requirement for an operation?
(Choose three.)