What sequence do you follow in master data maintenance to define the production of a material?
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling.
Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?
Which of the following requirements is supported by using process orders?
Which of the following properties about the planning functions available in SAP ECC applies?
When testing requirements planning in plant 1000, you receive the error message displayed below. Large numbers of materials are already available in plant 1000. As a first step in solving the problem, you activate requirements planning in the Customizing for plant 1000.

What further tasks do you perform before you can use requirements planning in plant 1000 in SAP ECC?
Where can you define the default storage location for the material component of a production order? (Choose three)
Which of the following statements about the planning functions available in SAP ECC is correct?
What master data do you need for material replenishment using the KANBAN procedure? (Choose two)
A material was planned in the context of SAP ECC material requirements planning. The MRP controller subsequently processed the material by manually converting a specific planned order into a production order.
The MRP controller now accesses the current stock/requirements list and the MRP list for this material and compares these two lists.
What do you have to consider for the two lists at this stage? (Choose two)