An EDGE Auditor is auditing a hospital design for Preliminary Certification. The EDGE Client has included photovoltaics as one of the energy measures resulting in an overall 21% saving in energy. The Auditor observes the photovoltaics are facing the wrong direction. What action should the Auditor take?
How many years of experience in related fields are required for applicants without a construction-related higher qualification to become an EDGE Expert?
Excellence Lawyers wish to obtain an EDGE Advanced certificate for an entire single floor office they own within a high-rise building. What is the way to model this project in EDGE?
An EDGE Auditor has been requested to provide auditing services to a development client. This particular client is well known as a hard negotiator and has offered the appointment on the basis of 50% payment for assessment and 50% upon successful EDGE certification of the building. What should the EDGE Auditor do?
In the EDGE software, which of the following does NOT produce grey water?
Which of the following elements is considered in EDGE to estimate water use in homes?
Which of the following measures provides the most attractive solution in the EDGE software for a hospital?
What is a valid use for collected rainwater to qualify for savings under EDGE?
An EDGE Auditor has received initial documentation from a Client which implies that measures not selected on the downloaded PDF can be claimed. What should the Auditor do?
In order for a project to complete the design certification stage requirements, the EDGE Client must do which of the following?