Huawei HCIP-Data Center Facility Deployment V2.0 - H12-425_V2.0-ENU Free Exam Questions

QUESTION NO: 1
The maximum charging capacity of UPS5000-E is ()

Correct Answer: A Vote an answer
QUESTION NO: 2
When the indoor unit and outdoor unit of NETCOL5000-A are separated and have not been installed, the refrigerant pipeline is ().

Correct Answer: D Vote an answer
QUESTION NO: 3
Temperature cloud map intelligence displayed in NetEco.

Correct Answer: B Vote an answer
QUESTION NO: 4
The optional temperature and humidity sensor for the UP55000 cannot be cascaded.

Correct Answer: A Vote an answer
QUESTION NO: 5
When the distance between the outdoor unit and the sea is 0.5km~3.7km, you need to configure (______) the outdoor unit. (Fill in the blank)
Correct Answer:
Class C
QUESTION NO: 6
Regarding the integrated UPS5000-E120K-HASBS statements, which of the following is incorrect?

Correct Answer: A Vote an answer
QUESTION NO: 7
Which of the following are indoor products of Huawei data center solutions? (Multiple choice)

Correct Answer: B,C,D Vote an answer
QUESTION NO: 8
When the UPS5000-E works in normal mode, in which condition will the UPS automatically transfer to bypass mode?

Correct Answer: D Vote an answer
QUESTION NO: 9
In video surveillance, if the storage time is short (one week), an SD card can be configured for storage.

Correct Answer: B Vote an answer
QUESTION NO: 10
Fusionllodule2000 UPS is listed and configured?

Correct Answer: B Vote an answer
QUESTION NO: 11
Two UPS2000-Gs with different software versions can be connected in parallel.

Correct Answer: A Vote an answer
QUESTION NO: 12
What are the certifications of FusionModule500&FusionModule800? (Multiple choice)

Correct Answer: A,B,C,D Vote an answer
QUESTION NO: 13
The device is connected to the ECC800 monitoring system through the smart ETH socket, using the () interface of the smart FTH socket.

Correct Answer: B Vote an answer
QUESTION NO: 14
Using UPS5000-E (50kVA power module), the actual load is 160kW, the rack is 1+1 redundant, the single-machine backup power scheme is adopted, the backup power scheme for each machine, 3 sets of batteries per rack, 40 cells per set, the capacity of the main switch box is:

Correct Answer: A Vote an answer
QUESTION NO: 15
What of the following statement of FusionModule2000 v3.0 version intelligent module status indication eLight function description is correct?

Correct Answer: B Vote an answer

QUALITY AND VALUE

Actual4test Practice Exams are written to the highest standards of technical accuracy, using only certified subject matter experts and published authors for development - no all study materials.

Tested and Approved

We are committed to the process of vendor and third party approvals. We believe professionals and executives alike deserve the confidence of quality coverage these authorizations provide.

Easy to Pass

If you prepare for the exams using our Actual4test testing engine, It is easy to succeed for all certifications in the first attempt. You don't have to deal with all dumps or any free torrent / rapidshare all stuff.

Try Before Buy

Actual4test offers free demo of each product. You can check out the interface, question quality and usability of our practice exams before you decide to buy.