Here are all the actual test exam dumps for IT exams. Most people prepare for the actual exams with our test dumps to pass their exams. So it's critical to choose and actual test pdf to succeed.

C-TS422-2504 Dumps - Grab Out For [NEW-2025] SAP Exam [Q15-Q31]

Share

C-TS422-2504 Dumps - Grab Out For [NEW-2025] SAP Exam

C-TS422-2504 Exam Dumps PDF Guaranteed Success with Accurate & Updated Questions

NEW QUESTION # 15
Which options do you have to post goods receipt for a process order?
Note: There are 2 correct answers to this question.

  • A. You post the entire manufactured quantity to one batch if the product quality remains consistent during production.
  • B. You post the entire manufactured quantity to one batch if the product quality changes during production.
  • C. You post the entire manufactured quantity to multiple batches if the product quality remains consistent during production.
  • D. You post the entire manufactured quantity to multiple batches if the product quality changes during production.

Answer: A,D


NEW QUESTION # 16
Which standard item categories can you select inside a bill of material (BOM)?
Note: There are 2 correct answers to this question.

  • A. WBS item
  • B. Work item
  • C. Class item
  • D. Non-plant item

Answer: C,D


NEW QUESTION # 17
How can you achieve a feasible production plan when there are capacity constraints?
Note: There are 3 correct answers to this question.

  • A. Determine a time period with available capacity on the planning board
  • B. Form optimum sequences to reduce setup times
  • C. Increase the capacity supply in a time-phased interval
  • D. Execute an infinite production planning run for the critical resources
  • E. Reduce the planning time interval

Answer: A,B,C


NEW QUESTION # 18
Which operations are considered in the capacity scheduling table?
Note: There are 2 correct answers to this question.

  • A. Operations assigned to a pacemaker work center
  • B. All operations
  • C. Sub-operations
  • D. Only bottleneck operations

Answer: C,D


NEW QUESTION # 19
You want to verify that the properties of a component batch align with the required properties of the raw material intended for a specific process order. What function do you use to accomplish this?

  • A. Batch determination
  • B. Batch where-used list
  • C. Batch information cockpit
  • D. Batch number assignment

Answer: A


NEW QUESTION # 20
Which settings can you make in a production scheduling profile?
Note: There are 3 correct answers to this question.

  • A. Automatic print on order creation
  • B. Automatic goods issue on confirmation
  • C. Automatic release on order creation
  • D. Default order types
  • E. Automatic goods receipt on confirmation

Answer: C,D,E


NEW QUESTION # 21
Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.

  • A. Assign the overall profile to the authorization profile
  • B. Create an object selection variant for alerts according to the priority of ATP categories
  • C. Create an object selection variant for production-planning-related alerts
  • D. Assign the alert profile to the overall profile

Answer: C,D


NEW QUESTION # 22
What are some advantages of using Kanban for material supply? Note: There are 2 correct answers to this question.

  • A. Replenishment is only triggered when components are required.
  • B. Replenishment is always triggered on a regular basis.
  • C. Material stock is built up for a long period of time in production.
  • D. Material is only kept available in small quantities in production.

Answer: A,D


NEW QUESTION # 23
What is the purpose of the pull list in material staging?

  • A. To control the flow of material from the central storage location to the production storage location
  • B. To control the flow of material from the production storage location to the central storage location
  • C. To control the flow of material from the supplier to the production storage location
  • D. To control the flow of material from the supplier to the central storage location

Answer: A


NEW QUESTION # 24
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of a material shortage. What must you do?
Note: There are 2 correct answers to this question.

  • A. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.
  • B. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
  • C. Add the agreement to the source list and mark it for MRP relevance.
  • D. Add the agreement to the quota arrangement and mark it for MRP relevance.

Answer: B,C


NEW QUESTION # 25
When does the system trigger replenishment for a Kanban container?

  • A. When you set the container to Empty
  • B. When you set the container to In transit
  • C. When you set the container to Waiting
  • D. When you set the container to Full

Answer: A


NEW QUESTION # 26
What are the selection criteria of a bill of material (BOM) alternative?
Note: There are 2 correct answers to this question.

  • A. Change number
  • B. Date
  • C. Material BOM usage
  • D. Lot size

Answer: B,D


NEW QUESTION # 27
How do you model a production line in repetitive manufacturing?

  • A. As a resource network
  • B. As an operation
  • C. As a routing
  • D. As a work center

Answer: D


NEW QUESTION # 28
What is the focus of repetitive manufacturing?

  • A. Detailed tracking of production orders
  • B. Low volume production
  • C. Period and quantity-oriented production
  • D. Production of lot size one

Answer: C


NEW QUESTION # 29
What are some SAP recommended guiding principles to achieve clean core operations?
Note: There are 3 correct answers to this question.

  • A. Establish an organizational structure, technical foundation, and transformation methodology for clean core.
  • B. Define roles and responsibilities as part of a process transformation office.
  • C. Establish release management.
  • D. Establish regular housekeeping tasks and procedures.
  • E. Integrate clean core practices in the end-to-end value process chain.

Answer: A,B,C


NEW QUESTION # 30
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What are the impacts of this decision?
Note: There are 3 correct answers to this question.

  • A. Production and procurement costs are managed on the sales order item level.
  • B. Net requirements calculation is carried out for every sales order individually.
  • C. Storage location MRP areas are required to manage sales-order-specific stock.
  • D. Sales orders have to be ATP-confirmed (available-to-promise) to be saved.
  • E. Planned orders are created in MRP with reference to sales orders.

Answer: A,B,E


NEW QUESTION # 31
......

Get New C-TS422-2504 Certification Practice Test Questions Exam Dumps: https://www.actual4test.com/C-TS422-2504_examcollection.html

Pass C-TS422-2504 Exam - Real Test Engine PDF with 82 Questions: https://drive.google.com/open?id=1J43eCNShLotVgDah_nT3T-5XRdghJO_H