Study HIGH Quality C-TPLM40-65 Free Study Guides and Exams Tutorials
Download SAP C-TPLM40-65 Exam Dumps to Pass Exam Easily
SAP C-TPLM40-65 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| Integration of QM with S&D and Service < 8% | Describe how QM integrates with Sales and Service |
| Implement & Configure Quality Planning 8% - 12% | Explain the configuration requirements of Quality Planning |
| Implement QM in Discrete Manufacturing > 12% | Describe the unique processes for implementing QM in Discrete Manufacturing |
| Implement & Configure Quality Inspection 8% - 12% | Explain the configuration requirements of Quality Inspection |
| Audit Management < 8% | Describe the process of Audit Management |
| Implement & Configure Quality Control > 12% | Explain the configuration requirements of Quality Control |
| Quality Notifications < 8% | Describe the purpose and features of Quality Notifications |
| Configuration and Organization < 8% | Configure Organizational elements used in QM |
NEW QUESTION 35
Which statements are correct? (More than one answer is true.)
- A. An inspection lot can be created automatically or manually.
- B. Details for the QM specific procurement processes as plant level are determined using the QM control key.
- C. When the indicator "QM procurement active" is set, quality management in procurement is activated for all plants of a client.
- D. Results recording cannot be carried out after the sample size has been determined.
Answer: A,B
NEW QUESTION 36
Details for the QM specific procurement processes at plant lever are determined using the Q control key.
- A. Incorrect
- B. Correct
Answer: B
NEW QUESTION 37
When you plan an audit for which component can you define partners? (2 correct Ans)
- A. Audit
- B. Audit Question
- C. CAPA
- D. Question
Answer: A,C
NEW QUESTION 38
The Quality notifications origin Q2 belongs to ______
- A. Internal problem notification
- B. Customer complaint
- C. none
- D. Complaint against a vendor
Answer: D
Explanation:
Explanation/Reference:
NEW QUESTION 39
Flexible inspection specifications are to be used where inspections can be fully planned in advance.
- A. Incorrect
- B. Correct
Answer: A
NEW QUESTION 40
The unit of measurement, target value, accuracy, and upper and lower specification limits are defined for each tolerance key.
- A. Incorrect
- B. Correct
Answer: B
NEW QUESTION 41
PI Sheet are available for Which statement is correct? (Please choose one correct answer)
- A. Discrete Manufacturing
- B. Repetitive manufacturing
- C. Process Manufacturing
- D. For All
Answer: C
NEW QUESTION 42
When an inspection plan includes multiple group counter, what determines the unit of measure ?
- A. Usage
- B. Material master
- C. Sampling procedure
- D. Lot size
Answer: A
NEW QUESTION 43
The notification category 05 belongs to ____.
- A. Service notifications
- B. Maintenance notifications
- C. Claim notifications
- D. General notifications
- E. Quality notifications
Answer: D
NEW QUESTION 44
You can assign follow-up actions to the codes in the code groups of the task catalog.
- A. Incorrect
- B. Correct
Answer: B
NEW QUESTION 45
Which statements are correct? (More than one answer is true.)
- A. You can set the "Post to Inspection Stock" indicator at various levels.
- B. If only the "Posting in Inspection Stock" indicator is set, then no inspection lots are created in the system.
- C. If you have made the required settings in the quality management view of the material master (QM inspection setup), an inspection lot is created at goods receipt.
- D. If a stock-relevant inspection lot is created at goods receipt, a transfer posting can be made for the stock exclusively using the inspection lot in Quality Management.
Answer: C,D
Explanation:
Explanation/Reference:
NEW QUESTION 46
What do the selection and evaluation of audit monitoring display? Note : 2 correct answer
- A. Tabular Overview lists of audit components
- B. Audit component according to different criteria
- C. The QM-STI(Quality Management- Statistic Interface)report
- D. Detailed audit valuation
Answer: A,B
NEW QUESTION 47
Which statements are correct? (More than one answers are true)
- A. No code groups from catalogs can be assigned to an inspection method.
- B. Code groups and codes from one catalog type can be grouped together in selected sets.
- C. Codes from selected sets can be used for results recording.
- D. An inspection method can also be directly created in a task list.
- E. Documents can be assigned to an inspection method.
Answer: B,D,E
NEW QUESTION 48
Object management records enable changes to a certain object to be documented.
- A. Incorrect
- B. Correct
Answer: A
NEW QUESTION 49
You can monitor the receipt of a quality certificate with and without inspection lot processing, independently of the time of goods receipt.
- A. Incorrect
- B. Correct
Answer: B
NEW QUESTION 50
If a delivery for a product or a material is creates, the QM automatically generates an inspection lot for the inspection relevant delivery items.
- A. Incorrect
- B. Correct
Answer: B
NEW QUESTION 51
Which of the following documents can you use as a reference document when creating a standard internal notification?
- A. Purchasing order
- B. Sales order
- C. Production Order
- D. Material Document
Answer: C
NEW QUESTION 52
Which statements are correct? (More than one answers are true)
- A. Each inspection is identified by an inspection point.
- B. In Customizing, you can define a maximum of 8 fields to identify the inspection point
- C. An inspection point contains the total quantity of all characteristics that are to be inspected for an operation, based on a partial quantity or a time interval
- D. You can record inspection results for an inspection lot, using defect data or characteristic results.
Answer: A,C
NEW QUESTION 53
If you want to determine the stage at which quality control takes place differently for particular combinations of material and customer, you must store these specifications in the quality info record for sales and distribution.
- A. Incorrect
- B. Correct
Answer: B
NEW QUESTION 54
You have assigned a dynamic modification level to an inspection plan Which dynamic modification criterion is pre-defined and not editable?
- A. Material
- B. Vendor
- C. Manufacturer
- D. Customer
Answer: D
NEW QUESTION 55
An inspection is completed when the usage decision is made.
- A. Incorrect
- B. Correct
Answer: B
NEW QUESTION 56
You can access the usage decision: (More than one answer are true)
- A. From results recording
- B. Automatically
- C. Manual
- D. Using the worklist
Answer: B,C,D
NEW QUESTION 57
......
Get 100% Real Free SAP Certified Application Associate C-TPLM40-65 Sample Questions: https://www.actual4test.com/C-TPLM40-65_examcollection.html