Here are all the actual test exam dumps for IT exams. Most people prepare for the actual exams with our test dumps to pass their exams. So it's critical to choose and actual test pdf to succeed.

Exam TCC-C01 Topic 2 Question 7 Discussion

Actual exam question for Tableau's TCC-C01 exam
Question #: 7
Topic #: 2
A consultant wants to improve the performance of reports by moving calculations to the data layer and materializing them in the extract.
Which calculation should the consultant use?

Suggested Answer: C Vote an answer

To improve performance by moving calculations to the data layer and materializing them in the extract, the consultant should choose calculations that benefit from pre-computation and significantly reduce the load during query time:
* Aggregation-Level Calculation: The formula SUM([Profit])/SUM([Sales]) calculates a ratio at an aggregate level, which is ideal for pre-computation. Materializing this calculation in the extract means that the complex division operation is done once and stored, rather than being recalculated every time the report is accessed.
* Performance Improvement: By pre-computing this aggregate ratio, Tableau can utilize the pre-calculated fields directly in visualizations, which speeds up report loading and interaction times as the heavy lifting of data processing is done during the data preparation stage.
References:
* Materialization in Extracts: This concept involves pre-calculating and storing complex aggregations or calculations within the Tableau data extract itself, improving performance by reducing the computational load during visualization rendering.

by Dwight at Dec 25, 2024, 09:02 PM

Comments

Chosen Answer:
This is a voting comment (?) , you can switch to a simple comment.
Switch to a voting comment New
Nick name: Submit Cancel
amenibouj
2025-01-28 23:35:39
Selected Answer: C
C. SUM([Profit])/SUM([Sales])
upvoted 1 times
...
HANANE
2025-01-06 13:29:06
i believe A is the Ok one
upvoted 1 times
...
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.